Skip to main content
← BACK TO ALL ALBUMS
Zebulon Kosted - Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114 Album Cover Artwork
Full-length
2021

Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114

Zebulon Kosted
🎵 10 Tracks🌍 United States

🎵ALBUM TRACKLIST (10 SONGS)

Full-length • 2021
1..Arrival of Two New HS-914 Long Range Scout Craft at Bay D6
03:39No lyrics available
2..Final Repairs on Orbital Broadcasting Unit in Service Room 4
05:52No lyrics available
3..Slow Approach of Parts Supply Ship on the Starboard Side of the Primary Communications Post
04:09No lyrics available
4..Launch of Belt Class Intelligence Probe from Bay A3
04:22No lyrics available
5..Listening to Solar Winds During Mid Shift Break
04:18No lyrics available
6..Incoming Communication from Satellite 2151 Alpha
06:26No lyrics available
7..Routine Calibration of the Hangar's Main Power Conduit
05:04No lyrics available
8..Encoded Message for High Command Clearance Level 8
04:11No lyrics available
9..Stealth Craft Engine Output Scan on Port Side
07:04No lyrics available
10..Shielding Raised Due to High Risk Analysis Determination
05:19No lyrics available